The London Borough of Merton has over 43 primary schools, responsible for the education of over 3,000 young pupils. The Borough’s schools consistently score well in the Ofsted rankings.
Every year, there is an increase in the rate of enrolment of pupils. Gorringe Park Primary, a Merton school, required extensions to their school and a refurbishment of their ICT system, as it was unable to cater for a modern curriculum. Blue Cube Connections was asked to review the existing ICT system and come up with a cost-effective solution, due to the constraints on the education budget.
Case Studies
Our Solutions
We extended the analogue connection boxes and voice cabling to improve the school’s voice network. A Voice over IP Solution would have been more effective, but the budget constraints led to selection of the alternate solution. Armoured fibre cable running in ducting was utilised to connect the new buildings and provide a fibre backbone. The cabling from the main admin server to the Headmaster’s and other offices were also enhanced. In order to minimise disruption to the school, the work was completed out of hours.
Case Studies
The Outcome
When teachers and pupils returned from the Christmas holidays, they were impressed with the new buildings and much improved ICT system.
Ready To Discuss Your Network Installation Project?
Data installation specialists installing systems that not only meet your current needs but have the additional capacity to cope with increased bandwidth demand.